March 2014-Present-City of Anaheim, Master Agreement
Vault 1 Rehab and Vault 2 Demolition
Work consisted of rehabilitation of Vault 1 with installation of structural panelized vault system within vault. Demolish Vault 2, and associated fiber optic relocation work
August 2014-Present- City of Anaheim, Master Agreement
GSE Switch Replacements
Work consisted of replacing existing GSE switches, and primary underground cables with new Vista gas switches (VGS) and primary underground cables.
September 2010-Present-Burns & McDonnell Tower Inspections-SCE Tehachapi Renewable Transmission Project Segments 4-11 located in Antelope Valley, CA
Inspection of lattice steel towers and pole climbing inspections from ground and air. Inspections of foundation conductor stringing, overhead ground wire installation, fiber optic cable installation and all related hardware. Various Work Orders.
May 2010-Present-City of Anaheim-Master Agreement
Preapproved to bid on projects coming out of City of Anaheim’s Public Utilities Electrical Division.
April 2010-Present-City of Riverside-Contractors Panel
Preapproved to bid on projects coming out of the City of Riverside’s Public Utilities Electrical Division.
April 2004-Present-City of Riverside/Contractors Panel, Qualified Electrical Contractor (QEC)
Agreement with City of Riverside to provide vault standby service including mandreling of conduit,
To various contractors wanting access to City of Riverside Utilities. Contract ongoing.
May 2007- Present- Southern California Edison, Reconductor of Die 12kv between Industry/Narrows Substation.
June 2007-Present- Southern California Edison, Reconductor extension 12kv line to Yucaipa Substation.
May 2007-June 2007- Southern California Edison, Pole Removal/Street Light install in Temecula, CA. Install 1,000 feet of 1/0 cable, 1,587 feet of #2, 1 PME, 150 KVA Transformer, 1 cap bank. Remove overhead conductor, 10 foot wood poles and associated hardware.
May 2007-June 2007- Southern California Edison, 12kv DSP Circuit install in San Jacinto, CA. Install 9,000 feet of 3/c-1000 cable, one 3-way gas switch, and two omni switches.
October 2006-November 2006-Southern California Edison, at Kitching and Ironwood in Moreno Valley, CA. Install 4,000 feet of 350 1/C PJ, 700 feet of #2 1/C PJ, 2 utility poles, and a 3W Ram Switch.
August 2006-September 2006-Southern California Edison, at State Street and Newport Road in Hemet, CA. Install 6,500 feet of 336 ACSR, 4th wire, 6,200 feet 350 1/C PJ, 1PME, and 3 padmount transformers.
July 2006-September 2006-Southern California Edison, Rule 20B Pechanga Parkway Temecula, CA. Install gas switches, burd switches, transformers, 20,000 feet of 750 12kV 1/C ALU PJ cable, and pole removal.
April 2006-July 2006 -Southern California Edison, Alessandro Substation (Trinity 12Kv) Moreno Valley, CA. Install 33Kv cable, 12Kv cable, gas switch at Alessandro Substation.
March 2006-April 2006-Southern California Edison, Rule 20A Whittier Blvd & Montebello, Whittier District. Overhead to underground conversion in Whittier, CA.
December 2005-March 2006-Southern California Edison, McLaughlin 12Kv, DSP 4th wire Newcomb Substation, Menifee, CA. Installation of new overhead facilities and equipment. Replacement of existing electrical line across 215 Freeway. Remove existing overhead facilities.
December 2005-March 2006- Southern California Edison, Wood Road & Kameria pole relocation and cap bank, Riverside, CA. Installation poles and removal of poles, transfer 10,400 feet of acsr cable, repair cab bank.
November 2005-December 2005-Southern California Edison, HC Meridan Line Extension at Cactus/215 Freeway Riverside, CA. Installation of new underground facilities and equipment for new commercial complex. Installation of 300 Kv transformers and related cable.
October 2005-November 2005-Southern California Edison, Cactus & Meridian Parkway Underground, at 215 Freeway in Riverside, CA. Install underground facilities and equipment, ram switches, gas switches, transformers, and PME's in City of Riverside San Jacinto District.
October 2005-Southern California Edison, Parma/Foote Plant Betterment Seal Beach, CA. Installation of new overhead facilities. Add circuit across 405 Freeway at Beverly Manor.
September 2005-December 2005-Southern California Edison, Rule 15 Line Extension-Downey Landing Rule 15, Lakewood, CA. Installation of new underground faciliteis and equipment. Removal of existing overhead facilities and equipment.
September 2005-November 2005- Southern California Edison, Bachelor 16Kv Reconductor San Pedro, CA. Replace 5,100 feet of 2/0 BC with 336 ACSR replace poles and set poles in South Bay District.
May 2005-December 2005- Southern California Edison, Kumquat 12Kv new circuit, Glendora, CA. Overhead distribution work, install new 12Kv circuit, replacement of single arms crossarms with double and double dead-end 4/0 wire, cut and kick poles and replace 75 KVA transformer.
March 2005-Decmber 2005 - Southern California Edison, Overhead removal, Everest 12Kv Mira Loma Substation, and Mira Loma Jr. Substation, Mira Loma, CA. Overhead/underground electrical construction consisting of the installation of new underground facilities and equipment.
2001-April 2005 - Southern California Edison SOLO Streetlight maintenance project. Overhead and underground electrical construction associated with the repair of the existing street light systems throughout the Edison territory within Southern California.
December 2004-March 2005 - Southern California Edison, Rule 20A, Whittier, CA. Installed underground cable, transformers, and burd switches, cutover to underground facilities, removed existing overhead facilities.
2004-2005 - Southern California Edison, Emergency work. Overhead and underground electrical construction associated with the repair of the existing street light systems throughout the Edison territory within Southern California.
September 2004-November 2004 - Southern California Edison, Rule 20A, Redlands Pole Risers. Overhead work consisting of the installation of riser poles for the installation of the conduit for the future Rule 20-A on a T & E basis.
September 2004-November 2004 - Southern California Edison, Eastgale-Palm Springs. Electrical construction Rule 20B.
May 2004-October 2004 - Southern California Edison, Rule 20A, Magnolia Avenue, Corona. Underground and overhead electrical construction consisting of the installation of new underground facilities and equipment to remove the existing overhead facilities and equipment.
April 2004-September 2004 - Southern California Edison, Capacitor Bank Project II, Metro East Region. Provide necessary supervision, labor, tools, materials and equipment, on a Fixed Unit Price basis to assemble and install, replace, remove and relocate capacitor banks and poles for the 2004 Capacitor Bank Program.
March 2004-October 2004 - City of Anaheim, Master agreement #12 FY 2003/2004, Pole replacement of overhead electric distribution system.
2002-2004 - Southern California Edison, Routine, Non-emergency electrical work as required by Edison's Power Deliver Business Line. Bullgang crew, Foothill District.
July 2003 - March 2005 - Southern California edison, Montebello District. Meter and service work on a T & E basis.
July 2003 - Southern California Edison, Monrovia District. Meter and service work on a T & E basis.
2002/2003 - Southern California Edison, City of Santa Ana. Overhead to underground conversion.
2002/2003 - Southern California Edison, Cherry Ave, Fontana. Overhead to underground conversion.
2002 - Southern California Edison, City of Fontana. Overhead to underground conversion.
2002 - Southern California Edison, City of Murrieta. Overhead to underground conversion.
2002 - ACU Electric, Seal Beach Project, Naval Weapons Station, Seal Beach CA. Set poles, and installation of the following: crossarms with V braces, pins and insulators, transformer, fused cut outs, lighting arrestors, ACSR conductor, ground wire, anchor plates and anchor rods, grown rods, jumper and energize line.
2002 - Southern California Edison, APL Substation. Construct a new 66kV customer substation.
2002 - Southern California Edison, Eagle Rock Substation. Time & Material project-installing additional facilities and upgrading existing facilities for greater power demand.
2001 - Cutler-Hamner- Kerr-McGee Chemical Plant in Henderson Nevada. Project consisted of pole line installation including 12kv line extension.
2001 - Earthtech Environmental, High Voltage Services for Various Sites, Edwards AFB. Modify existing substation, installation of distribution transformer and panel board for various activities,
2001 - City of Riverside, RIV-1001, Bullgang. Electrical installation of electric conductor per city bid 010511 and per master agreement 4/24/01, which is incorporated by reference. Job 100% Complete.
2000/2001 Irvine Development Company, Laidlaw 69KV Line Relocation, Irvine CA. Provide design, plans, specifications and field operations to relocate 69KV overhead line for Laidlaw Gas co-generation facility.
2000/2001 Operations ceased by SCE. Deregulation created problems. All Contractor operations were curtailed. - Southern California Edison, Dock Crew, Streetlight Maintenance Santa Ana District. Repairs and maintenance of streetlight systems.
2000/2001 Operations ceased by SCE. Deregulation created problems. All Contractor operations were curtailed- Southern California Edison, Dock Crew, and Streetlight Maintenance Ontario District. Repairs and maintenance of streetlight systems.
1999/2001 Operations ceased by SCE. Deregulation created problems. All Contractor operations were curtailed-Southern California Edison, Dock Crew Work, Bull-Gang, Foothill District, including installation of underground cable for SCE distribution system, underground.
1997/2001 Operations ceased by SCE. Deregulation created problems. All Contractor operations were curtailed-Southern California Edison, Dock Crew Work, Bull-Gang, Ontario District, including installation of underground cable for SCE distribution system, underground.
2000 - Southern California Edison, Alder Substation. Installing additional facilities and upgrading existing facilities for greater power demand.
2000 - Southern California Edison, Soquel Substation. Installing additional facilities and upgrading existing facilities for greater power demand.
2000 - Southern California Edison, Ravendale Substation. Installing additional facilities and upgrading existing facilities for greater power demand.
2000 - Southern California Edison, City of Sierra Madre. Overhead to underground conversion.
1999/2000 - Southern California Edison, Time & Equipment. Work consisted of making 12Kv lines ready for conversion of overhead to underground.
1999 - Southern California Edison. Pole replacement project. Replace deteriorated poles in SCE's Covina District.
1997/1999 - Southern California Edison. Pole replacement project. Various work orders, various districts.
1999 - Southern California Edison, Pardee Substation.
Installation of 220KV-capacitor rack, disconnects, reactors and associated work.
1999 - Southern California Edison, Day Rate Work, Bull-Gang, Foothill District, including installation of underground cable for SCE distribution system, underground.
1998-99 - Southern California Edison, El Dorado Substation.
Installation of new 220KV position. Replacement of 10 each 220KV Circuit Breakers.
1998 - Southern California Edison, Lugo Substation
Replacement of 13.8KVcircuit breakers & reactors.
1998 - Southern California Edison, Substation Division.
Time & equipment crew, replace circuit breakers, various substations.
1998 - Southern California Edison, Rule 20 Conversions, Redlands District.
1998 Thermo Ecotek, Mountain View Power Co. & Riverside Canal Power Co. Steam Generating Plants. Insulation testing (megger) motors, 480V, 4160V, 2100V. Regular maintenance and repairs provided for startup of generating facility.
1998 - Southern California Edison, Temecula Overhead Relocation for Rogers/Dale Project, including coordination with CalTrans, CHP & Edison for string conductors across Interstate 15 in Temecula.
1997-1998 - Southern California Edison, Dock Crew, Overhead & Underground Distribution Maintenance & Construction. Various Districts. Includes construction & maintenance of overhead & underground distribution system.
1997 - Southern California Edison, Dock Crew Work, Underground/Overhead Makeup Crew.
Foothill district.
1997/1998 - Irish Construction, Subcontract, City of Anaheim. Overhead to underground. Installed 2,000 feet of two million copper 69KV, including pot heads and splices. Made cut over and demolition of overhead system. District No. 25.
1997 - Southern California Edison, Dock Crew Work, Foothill, Ontario & Palm Springs Districts, includes maintenance & construction of SCE underground distribution system, overhead and underground.
1996 - Southern California Edison, Replace Suspension Insulators in SCE Substations, Redondo Beach and Huntington Beach.
1996-97 - Southern California Edison, Storm Relief, Assist SCE repair distribution systems, put systems back on-line during winter storms.
1996 - Replace Poles, Redlands District Southern California Edison
1996 - Replace Antennas, Las Vegas, Various sites.
AT&T Wireless Services, Las Vegas, NV.
1996 - Replacement of High Loss Series Capacitor Units, SCE El Dorado Substation
Southern California Edison, El Dorado Sub, NV.
1996 - Repair Underground Distribution System, Manch III, Nellis Air Force Base
Installation of 14.4 KV pad mounted switch, installation of primary cable, relocation of padmounted transformers, installation of secondary cable, installation of 120/240 free standing distribution panels, and installation of underground house services. Nellis Air Force Base, Las Vegas NV.
1995 - California Corridor Constructors/Laidlaw Gas Recovery Systems, Subcontract, 66KV Poleline Relocation, Irvine CA. Relocation of wood poles, and installation of steel poles for relocated 653 ACSR, 69 KV line, on the San Joaquin Hills Transportation Corridor. Irvine CA.
1995 - Subcontractor for Reynolds Electrical and Engineering Co., Mercury Test Site.
Power Distribution System, Yucca Flats Power Line. Construct four miles of overhead pole line, 34.5 KV. Mercury, Nevada.
1994 -Overhead Power Distribution, Power Distribution Facility Maintenance, including replacing power poles and re-conductor related work. City of Los Angeles, Dept. of Water & Power, as a sub contractor to the prime electrical contractor.
1994 - Southern California Edison 900 MZ Radio Project. Install conduit and related materials for antenna mast and communications equipment at 30 substation locations in the state of California and Nevada. Southern California Edison Company, Alhambra, CA.
1994 - Overhead Power Distribution, Power Distribution Facility Maintenance, including replacing power poles and re-conductor related work. City of Los Angeles, Dept. of Water & Power, on behalf of Henkles & McCoy, Inc., Prime Contractor.
1994 - Repair Electrical Distribution System, Marine Corps Air/Ground Combat Center, Twentynine Palms, CA.
1993 - Upgrade Ground Grid for Center Magazine Area at Twentynine Palms, CA. Work consists of installing a grounding system for electrical protection to ammunition magazine areas. Marine Air Ground Combat Center, Twentynine Palms, CA.
1993 - Install Ceiling Fans and related lamp fixtures. Requires the installation of 358 ceiling fans and light fixtures in housing units located at Fort Irwin, CA, U.S. Department of the Army.
1992-Maintenance of overhead and underground power distribution facilities. Work includes maintenance of existing facilities as well as installation and upgrade for increased power demand. City of Pasadena, Water and Power Department.
1992-Install additional facilities to provide for greater power demands. Include installation of additional switch and capacitor banks and installation of new power transformer. Southern California Edison Company, North Oaks Substation.
1992-Install additional facilities to provide for greater power demands. Include installation of additional switch and capacitor banks and installation of new power transformer. Southern California Edison Company, Data Bank Substation.
1992-Maintenance of overhead and underground power distribution facilities. Work includes maintenance of existing facilities as well as installation and upgrade for increased power demand. Southern California Edison Company, Santa Barbara District.
1991-Maintenance of overhead and underground power distribution facilities. Work includes maintenance of existing facilities as well as installation and upgrade for increased power demand. Southern California Edison Company, Antelope Valley District.
1991-Install additional facilities to provide for greater power demands. Include installation of additional switch and capacitor banks and installation of new power transformer. Southern California Edison Company, Southbase Substation.
1991-Install additional facilities to provide for greater power demands. Include installation of additional switch and capacitor banks and installation of new power transformer. Southern California Edison Company, Chiquita Substation.
1991-Install additional pole facilities. Work includes installation of new pole line for expanded service area. Southern California Edison Company, San Jacinto Valley District.
1991-Underground Splicing and Cable make-up and installation of new underground facilities and maintenance of existing facilities. Various overhead work, including installation of new facilities for an increased power demand. Southern California Edison Company, San Jacinto Valley District.
1991-Repair 12KV system and re-conductor existing facilities for conversion from 4kv to 12KV system. Work includes installation of new poles and conductor. Southern California Edison Company, San Jacinto Valley District.
1990-Underground Splicing and Cable make-up and installation of new underground facilities and maintenance of existing facilities. Various overhead work, including pole removal and installation. Southern California Edison Company, San Bernardino District.
1990-Electrical Modification to Savage Substation, Victorville, CA. Includes electrical upgrade to existing facilities to accommodate additional electrical requirements. Southern California Edison Company.
1990-Electrical Modifications to Corona Substation, Corona, CA. Includes installation of new fixtures in existing substation to increase power load and meet future demand requirements. Southern California Edison Company.
1990-Underground Splicing and Cable make-up and installation of new underground facilities and maintenance of existing facilities throughout the Los Angeles Area. Los Angeles Department of Water and Power.
1989-Maintenance of overhead power facilities, including installation and extension of power lines. Southern California Edison Company, Fullerton District.
1989-Electrical Modification to Repro Substation. Required modifications and upgrades to increase power capacity of Repro Substation in El Segundo, California. Southern California Edison Company.
1989-Install additional electrical equipment and modify current equipment to meet additional electrical demands. Fairview and Trask Substations, California. Southern California Edison Company.
1989-Install additional electrical equipment and modify current equipment to meet additional electrical demands. Victor Substation, Victorville, California. Southern California Edison Company.
1989-Install additional electrical equipment and modify current equipment to meet additional electrical demands. Archline Substation, Rancho Cucamonga, California. Southern California Edison Company.
1989-Install additional electrical equipment to meet increasing electrical demands for Saugus Substation. Work includes installing and connecting circuit breakers, capacitors and other work related to increasing load capacity. Southern California Edison Company.
1989-Install additional electrical equipment to meet increasing electrical demands for Goldtown Substation. Work includes installing and connecting circuit breakers, capacitors and other work related to increasing load capacity. Southern California Edison Company.
1989-Install underground cable and equipment in the vicinity of distributing station 135, including communication cable, cable racking, splicing and termination. Los Angeles Department of Water and Power.
1989-Install 1.5 miles of transmission and distribution lines, crossarms, switches, equipment and 653/336 conductor. Rebuild and re-conductor 2.65 miles of existing distribution poles. Southern California Edison Company, Murietta.
1988-Overhead Power Distribution, including installation of new overhead facilities and maintenance of existing facilities. Various overhead work, including pole removal and installation. Southern California Edison Company, Redlands District.
1988-Install underground aluminum cable and equipment in the vicinity of distributing station 136, including communication cable, cable racking, splicing and termination. Los Angeles Department of Water and Power.
1988-Convert existing 4 KV and 16 KV underground system. Pulling primary and secondary cable, riser construction and termination, convert customer services to underground system. Southern California Edison Company, Montebello District.
1988-Install underground 4.8 KV lead-covered cable and equipment in the vicinity of Distributing Station 96, including cable racking, splicing and termination. Los Angeles Department of Water and Power.
1988-Re-conductor existing facilities. Includes replacing existing power cable with cable of a larger size capable of handling greater power requirements. San Diego Gas and Electric.
1988-Install underground power cable. Includes installation of 4800-volt lead cable in existing ducts from newly built substation to existing substation. Los Angeles Department of Water and Power.
1988-Build new substation, Ironwood Sub, Moreno Valley CA. Work includes all cable runs, steel facility erection, MEER building construction, installing and connecting transformers, circuit breakers, capacitors and other work related to building a substation from the ground up. Southern California Edison Company.
1988-Replace underground power cable. Includes removal and installation of lead cable in existing ducts from substation to distribution station. Los Angeles Department of Water and Power.
1987-Overhead Power Distribution, Power Distribution Facility
Maintenance, including replacing power poles and re-conductor related work. City of Los Angeles, Dept. of Water & Power, on behalf of Cal State Electric, Inc, Prime Contractor.
1987-Underground Splicing and Cable make-up, Overhead and Underground Power Distribution. Contract for Southern California Edison Company, El Toro District.
1986-Power line cutover, 4 KV to 12 KV including installation and removal of transformers, installation and removal of power poles and facilities, and re-conductor of related work. Southern California Edison Company, Inglewood District.
1986-Underground and Overhead Power Distribution, Power Distribution Facility Maintenance, including replacing power poles and re-conductor related work. Southern California Edison Company, Covina District.
1985-Underground Cable Splicing and assembly, including vault related work. Overhead Power Distribution Maintenance, including relocation of existing facilities, and construction of new power distribution lines. Southern California Edison Company, Covina District.
1985-Relocation of existing Overhead Power Lines, including removal and installation of power facilities. Gray Family Corporation, Gardena.
1985-Re-conductor of existing Power Distribution Facilities, including removal and installation of power facilities, and maintenance of existing facilities. Southern California Edison Company, Fullerton District.
1984-Street Light Installation and Conversion, including installation of new street lighting, street lighting posts and fixtures, and conversion of existing streetlights. Southern California Edison Company, Santa Monica District.
1984 - Install temporary power and lighting facilities for use during the Olympic Games, including installation of power poles, lighting fixtures and other facilities. Los Angles Olympic Organizing Committee.
1983 - Street Light Conversion involving the removal and replacement of 6,000 streetlights, including re-arrangement of circuits and removal of arc circuits. Southern California Edison Company, Montebello District.